The Burgess Shale

Watch the Fossil Cam being installed

The fossil cam generates its own electricity from solar panels and a wind turbine and stores the power in 12 car batteries. This makes for a heavy load – at 635 kilograms or 1 400 pounds the fossil cam pressed the limits of the helicopter used to install it. It took a skilled pilot, calm conditions and two Parks Canada staff to receive the heavy load.